Specification of Construction
* The name of construction: SJU 50 year-memorial Haeseong Hall
* Floor space : 1,228.84m2 (371py)
- Scale and structure: 1 story below and 2 above the ground (iron bar & concrete)
- total floor area: 2,209m2(668py)
- The expense of construction: 8 billion won

* The name of construction: Parking Place of Haeseong Hall
* Floor space : 567m2 (172py)

* construction period: 8 months after ground-breaking

 

Main Chapel &
Concert Hall
1 story below &
2 above the ground
Main Chapel, Concert Hall,
conference room
600py
(capacity: 1,000)
 



¼­¿ïÀå½Å´ëÇб³ / [464-742] °æ±âµµ ±¤Áֽà °æ¾È·Î145 / ´ëÇ¥ÀüÈ­:031-799-9000 / FAX:031-765-1232 / Copyright¨Ï 2001-2013 Seoul Jangsin University. All rights reserved. Produced by S.L.I.M
»çÀÌÆ®¸µÅ©
Çб³¼Ò°³ ÀÔÇоȳ» Çлç¾È³» ´ëÇбⱸ Á¾ÇÕ¼­ºñ½º °³ÀÎÁ¤º¸Ã³¸®¹æħ Á¤º¸°ø°³